Public Service Project Fact Sheets

We are currently in the process of updating our project fact sheets to ensure they provide the most accurate and up-to-date information. Thank you for your patience and understanding during this period of improvement.

Projects In Design

17th Ave Sidewalks - I-71 to Billiter Blvd

2023 Phase 1 Crosswalk Improvements

2023 Phase 2 Crosswalk Improvements

4th St at 19th Ave Signal Replacement

4th Street Signals - 1st to 17th Avenue

Agler Road Sidewalks - Sunbury Road to Cassady Avenue

Astor Park Streetscape

Avery Road Widening - Hayden Run Road to Lexi Lane

Barnett Rd Sidewalks- Astor Ave to Main St – Pedestrian Safety

Blossom Field Blvd Improvements - Broad Street to Westbourne Avenue

Broad Street (East) Phase 2 Widening - Outerbelt Street to Reynoldsburg-New Albany Road

Broad Street (West) and Doherty Road – Widening

Cassady Avenue Shared Use Path - 7th Avenue to Plaza Properties Boulevard

Cassady Avenue Widening - Delmar Drive to 7th Avenue

Central College Rd & Ulry Rd Widening - Lee Rd to Sandimark Pl

Courtright Road Sidewalks – Refugee Road to Groves Road

E. 5th Ave – Safety Improvements (Wall St. to N 5th St.)

Eakin Rd Shared-Use Path-Wayne Ave to Whitethorne Ave

Eastland Area Stormwater Basin

Gantz Road Bridge over I-270 Improvements

Georgesville Rd Improvements - IR-270 to Sullivant Ave

Georgesville Road Shared Use Path - Parkwick Drive to Sullivant Avenue_SUP

Greenlawn Avenue and Thurman Avenue at High Street Intersection Improvements

Hamilton Road (North) Phase C Widening - Dublin Granville Road to Central College Road

Harrisburg Pike at Brown Rd Signal Replacement

Hiawatha Park Drive Shared Use Path – Velma Ave to Hudson Street

High Street (South) At Dering Avenue Signal Replacement

Hilliard Rome Road at Renner Road Intersection Improvements

Indianola Ave (North Broadway to Oakland Park Avenue)

Livingston Ave Improvements - Alum Creek Trail to James Rd

Lockbourne Rd Streetscape Improvements - Watkins Rd to SR104

Kimberly Pkwy Bridge Replacement - Over Mason Run

McComb Road Bridge over I-270 Improvements

McNaughten Rd Improvements - Main St to Broad St

Mt Vernon Ave Area Phase 1 Improvements

N 4th St – Bike Lane Improvements (Warren St. to E Hudson St.)

Polaris Parkway Widening - Gemini Pl to South Olde Street Rd

Pull Box Repair Phase 1

Refugee Rd Sidewalks - Noe Bixby to Blue Moon

Rich St at 3rd St, 4th St, 5th St, and Grant Ave Signal Replacement

Roberts Rd at Frazell Rd and Spindler Rd Intersection Improvements

Sancus Blvd Widening – Roadway Improvements

Sancus Shared Use Path

South Linden Sidewalk 2017 - UIRF

SR 161 Improvements - Busch Blvd to Ambleside Dr

SR 161 at Linworth Road Intersection Improvements

SR 161 Phase 2 - Tamarack Blvd, Sharon Woods Blvd, Beechcroft Road

Trabue Rd Bridge Improvements - Over IR-270

Tussing Road Shared Use Path - Brice Road to Hines Road

Walford St, Sharbot Dr, and Northtowne Blvd Sidewalks - Pedestrian Safety

Westbourne Avenue Phase 1 Extension – Taylor Station Road to Blossom Field Boulevard

Hiawatha Park Drive Shared Use Path – Velma Ave to Hudson Street

Projects In Construction

Projects Completed