Working with federal authorities and cybersecurity experts, the City of Columbus continues its investigation and response to a July cybersecurity incident.
The following information is to be used as a checklist for the inspection process once a water service plan has been approved by the Division of Water.
Select the drawing that best describes your approved water service plan to download an inspection checklist. Additional inspections may be required. See the Plan Notes on your signed water service plan for additional information.
Water Service Plan Inspection Responsibility(PDF, 443KB). illustrates which section (Permits, Utility Meter Services, Backflow) must complete an inspection based on the type of service installed.
DCDA in Vault New-Fire-Service-Checklist-Meter-Vault(PDF, 241KB) Meter in Vault, Backflow Preventer in Heated Enclosure New-Domestic-Water-Service-Checklist-Underground-After-Meter(PDF, 245KB) Meter Inside Building with Backflow Preventer New-Domestic-Water-Service-Checklist-Inside-Only(PDF, 244KB) RPDA or DCDA in Heated Enclosure New-Fire-Service-Checklist-In-Heated-Enclosure(PDF, 244KB) RPDA or DCDA Inside Building New-Fire-Service-Checklist-Inside-Only(PDF, 242KB)
Backflow Office 910 Dublin Road Columbus, OH 43215 Weekdays 7:00 am - 3:30 pm
Call: 614-645-6674 Email: backflow@columbus.gov
Backflow Home Consumer's Page Tester's Resources Tester's Information New Construction
Utilities Home
New Service
Backflow Home
Com-Til Mulch
Documents, Standards & Specifications
Get Certified for Utility Work
Rates, Fees, and Connection Charges
Request a Power Outage
Stormwater Drainage
Water Quality Report