Linden Area Project

The City is under orders from the Ohio Environmental Protection Agency to eliminate sanitary sewer overflows. Blueprint Columbus is a new initiative to meet the requirements of those orders. Homes in the North Linden 1 project area are connected to a city sanitary sewer that contributes to those overflows. For information about overflow points and their exact locations, please reference SSO discharge numbers 18 and 23 at Sewer Overflow Discharge Information (SSOCSO).

Linden Project Area Maps

Linden is comprised of three project areas: North Linden 1, North Linden 2, and South Linden.

North Linden 1

North Linden 1 is the first project area in Linden to begin Blueprint implementation. View the map to see if your home is in the current Linden Blueprint project area, see project schedules, and view potential locations for rain gardens and porous pavement in the area. Simply type in an address and the map will zoom in on the area.  Visit blueprintneighborhoods.com/neighborhoods/north-linden-1 to learn more and sign up for construction updates.

Interactive Project Area Map

North Linden 1 Project Area Green Infrastructure Descriptions:

Parking Studies

View the completed parking analysis and survey of actual parking utilization for the entire project area. The analysis involved counting homes in the area and determining parking needs based on those counts. The project area was broken down by individual blocks on each side of the street in order to match available parking to the area’s residents and their vehicles.